TRABAJOS DE MODIFICACIÓN DE BOGIES Y REVISIÓN IM4 PARA DOS BOGIES BITRAC M.B7

TRABAJOS DE MODIFICACIÓN DE BOGIES Y REVISIÓN IM4 PARA DOS BOGIES BITRAC M.B7


  • 19/01/2018
Project Description

Design, manufacturing and assembly of the new gear wheels of the gear-unit.

Gear wheel removal and replacement.

IM4 revision of the bogie and its components.

  • Brake rigging maintenance
  • Underframe conditioning + revision of facilities
  • Assembly of brake rigging + pneumatic test
  • Gear-unit ext. conditioning
  • Output shaft removal.
  • Inspection and measures
  • Reverse engineering and manufacturing of the new gear wheels
  • New gear wheel-shaft press-fit.
  • New output shaft assembly
  • Bogie press test
  • Inspection of cracks, burn stains and adherences and brake disc wear check
  • Inspection of shoe wear
  • Inspection of underframe cracks and fissures
  • Wheel visual inspection
  • Running surface diameter measurement
  • Wheel flange measurement
  • Tread surface ultrasound test
  • Axle-box exterior inspection
  • Axle-box interior inspection
  • Bearing overhaul (bearing reconditioning)
  • Pneumatic installation general inspection
  • Pneumatic circuit leak tightness test
  • Visual inspection of electrical installation
  • Electric strength and insulation resistance check
  • Fixing check and status visual inspection
  • Revision of main gear-unit and coupling